How often should a scaffold be inspected?

  • Upon handover
  • Before first use
  • At intervals not exceeding 7 days
  • After any event that may jeopardise strength or stability of the scaffold (adverse weather, unauthorised access, collision, new excavations or a change in ground conditions etc.)
  • After any alterations/modifications